GB 50387-2006 冶金机械液压、润滑和气动设备工程安装验收规范 (英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

4.3 Raw Materials

Dominant Items

4.3.1 The model,specifications,quality,quantity and performance of raw materials and standard elements shall conform to the requirements of the design technical document or current national product standards.Acceptance shall be performed upon mobilization with corresponding record made.In case reinspection is specified in the design technical document or related national standards,re-inspection shall be performed as specified.

Quantity to be checked:Check all of quality certification documents.Randomly check 1% of actual products(not less than five pieces).

Inspection method:Check the quality certification documents,re-inspection record and acceptance record;appearance inspection or actual measurement.