GB 50387-2006 冶金机械液压、润滑和气动设备工程安装验收规范 (英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

5.7 Installation of a Complete Set of Hydraulic(Lubrication)Station

General Items

5.7.1 The allowable deviation for installation of a complete set of hydraulic(lubrication)station shall comply with the requirements in Table 5.7.1.

Quantity to be checked:100%.

Inspection method:See Table 5.7.1.

Table 5.7.1 Allowable deviation for installation of a complete set of hydraulic(lubrication)station

img