3.2 Equipment Foundation
Ⅰ Dominant Items
3.2.1 The strength of equipment foundation shall conform to the requirements of the design technical document.
Quantityto be checked:100%.
Inspection method:Check the data for foundation handover.
3.2.2 Prior to installation of equipment,it is required to prepare the arrangement of central point and elevation benchmark in accordance with the construction drawing and surveying control network,then arrange the central point and elevation benchmark according to the above arrangement,and finally conduct shaft plumbing.
Quantity to be checked:100%.
Checking method:Check the list of surveyingresults and carry out observation.
Ⅱ General Items
3.2.3 The axis position,elevation and dimension of equipment foundation and the location of anchor bolt shall conform to the requirements of the design technical document or the related regulations of current national standard GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering.
Quantity to be checked:100%.
Inspection method:Check the re-examination record.
3.2.4 It is required to clean up greasy dirt,broken stones,soil and water on the surface of equipment foundation and within the prepared holes for anchor bolts,and to well protect the embedded thread and nuts of anchor bolts.
Quantity to be checked:100%.
Inspection method:Visual inspection.