
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
5.3 Installation of Plate-Type Feeder
General Items
5.3.1 The allowable deviation for installation of plate-type feeder shall be in accordance with those specified in Table 5.3.1.
Inspection quantity:exhaustive check.
Inspection method:see Table 5.3.1 and Figure 5.3.1.
Table 5.3.1 Allowable Deviation for Installation of Plate-type feeder

Table 5.3.1(Continued)


Figure 5.3.1 Plate-type feeder installation diagram
1-Sprocket shaft;2-Straight edge;3-Level;4-Roller;5-Tentioning wheel;6-Base;7-Lower roller;8-Frame