SH/T3169-2012长输油气管道站场布置规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

3.17 Pig Receiver and Launcher

The critical components of pipeline cleaning equipment,installed at both ends of a pipeline to launch and receive the pigs.